Vermont nuclear plant searching for missing fuel rods



 Science > Prophecies-Of-Nostradamus > Vermont nuclear plant searching for missing fuel rods

LINK TO THIS PAGE  


rating :  0   |  0


  Page 1 of 1
Topic: Science > Prophecies-Of-Nostradamus
User: "TonyZ2001"
Date: 22 Apr 2004 04:56:24 AM
Object: Vermont nuclear plant searching for missing fuel rods
Vermont nuclear plant searching for missing fuel rods
Associated Press
MONTPELIER, Vt. - Two pieces of a highly radioactive fuel rod are missing from
a Vermont nuclear plant, and engineers planned to search onsite for the nuclear
material, officials said Wednesday.
The fuel rod was removed in 1979 from the Vermont Yankee reactor, which is
currently shut down for refueling and maintenance. Remote-control cameras will
be used to search a spent fuel pool on the property, officials said.
"We do not think there is a threat to the public at this point. The great
probability is this material is still somewhere in the pool," said Nuclear
Regulatory Commission spokesman Neil Sheehan.

But Sheehan said it was possible the spent fuel was mixed in with a shipment of
low-level nuclear waste and ended up at a repository in South Carolina, or a
facility in Washington state. He said it was also possible it was taken to a
nuclear testing facility run by General Electric, which designed the plant.
The material would be fatal to anyone who came in contact with it without being
properly shielded, Sheehan said. Spent nuclear fuel also could be used by
terrorists to construct so-called dirty bombs that would spread deadly
radiation with conventional explosives.
The NRC is helping plant officials in the search. The rod was part of the fuel
assembly used to power the reactor. One of the missing pieces is about the size
of a pencil. The other piece is about the thickness of a pencil and 17 inches
long.
"It would be very difficult to remove this material from the site without
somebody knowing about it," Sheehan said. "It would set off radiation
monitors."
Sheehan cited the heightened awareness of the need to control nuclear material
that followed the Sept. 11 terror attacks. "We don't want this falling into the
wrong hands," he said. "This is something we would never take lightly."
Gov. James Douglas, after speaking Wednesday afternoon with the head of the
NRC, said he was "very concerned" about the missing fuel at the plant, run by
Entergy Nuclear.
"This situation is intolerable," he said in a statement.
In 2002 a Connecticut nuclear plant was fined $288,000 after a similar loss.
That fuel was never accounted for.
Vermont Yankee is located in the southeastern town of Vernon, on the border
with Massachusetts and New Hampshire.
The state's Public Safety Department and Homeland Security Unit also were
notified of the missing fuel.
.

 

NEWER

pg.716     pg.544     pg.412     pg.311     pg.234     pg.175     pg.130     pg.96     pg.70     pg.50     pg.35     pg.24     pg.16     pg.10     pg.6     pg.3     pg.1

OLDER